Grue lourde · port DE · 2024

Liebherr

Brake, Germany

Pays
Germany
Année
2024
Équipe
3–6 specialists
Durée
4–8 weeks

Scope

Electrical installation and commissioning of a portal crane: e-drive, cable drum, video monitoring and control systems, with testing support. The crew installed and connected the drive and control systems and supported acceptance testing.

Défi

A port-crane delivery with electric-drive systems came with strict safety and acceptance requirements that the installation and testing had to satisfy before operation.

Rôle ARKTIS

Electrical installation and commissioning-support crew, executing to the manufacturer’s design and supporting the test and acceptance sequence.

/ résultat

The portal-crane systems were prepared for acceptance and operation.