Zware kraan · haven DE · 2024
Liebherr
Brake, Germany
Land
Germany
Jaar
2024
Ploeg
3–6 specialists
Duur
4–8 weeks
Scope
Electrical installation and commissioning of a portal crane: e-drive, cable drum, video monitoring and control systems, with testing support. The crew installed and connected the drive and control systems and supported acceptance testing.
Uitdaging
A port-crane delivery with electric-drive systems came with strict safety and acceptance requirements that the installation and testing had to satisfy before operation.
ARKTIS-rol
Electrical installation and commissioning-support crew, executing to the manufacturer’s design and supporting the test and acceptance sequence.
/ resultaat
The portal-crane systems were prepared for acceptance and operation.