Zware kraan · haven DE · 2024

Liebherr

Brake, Germany

Land
Germany
Jaar
2024
Ploeg
3–6 specialists
Duur
4–8 weeks

Scope

Electrical installation and commissioning of a portal crane: e-drive, cable drum, video monitoring and control systems, with testing support. The crew installed and connected the drive and control systems and supported acceptance testing.

Uitdaging

A port-crane delivery with electric-drive systems came with strict safety and acceptance requirements that the installation and testing had to satisfy before operation.

ARKTIS-rol

Electrical installation and commissioning-support crew, executing to the manufacturer’s design and supporting the test and acceptance sequence.

/ resultaat

The portal-crane systems were prepared for acceptance and operation.