Schwerlastkran · Hafen DE · 2024
Liebherr
Brake, Germany
Land
Germany
Jahr
2024
Team
3–6 specialists
Dauer
4–8 weeks
Scope
Electrical installation and commissioning of a portal crane: e-drive, cable drum, video monitoring and control systems, with testing support. The crew installed and connected the drive and control systems and supported acceptance testing.
Herausforderung
A port-crane delivery with electric-drive systems came with strict safety and acceptance requirements that the installation and testing had to satisfy before operation.
ARKTIS-Rolle
Electrical installation and commissioning-support crew, executing to the manufacturer’s design and supporting the test and acceptance sequence.
/ ergebnis
The portal-crane systems were prepared for acceptance and operation.