Ardelt / Weserport
Bremen, Germany
Scope
Electrical installation of Tukan K harbour-crane equipment: electrical container, drive and control connections, cable infrastructure, PLC/HMI and commissioning support. The crew installed and connected the crane electrical systems and supported testing through to handover.
Herausforderung
An outdoor port environment, heavy equipment interfaces and strict handover and testing requirements meant the crane electrical works had to be both robust and precisely documented for acceptance.
ARKTIS-Rolle
Electrical installation and commissioning-support crew for the crane systems, executing to the manufacturer’s design and supporting site acceptance.
/ ergebnis
The crane electrical systems were prepared for testing, handover and site acceptance.