Grue lourde · port DE · 2024–2025

Ardelt / Weserport

Bremen, Germany

Pays
Germany
Année
2024–2025
Équipe
4–8 specialists
Durée
6–10 weeks

Scope

Electrical installation of Tukan K harbour-crane equipment: electrical container, drive and control connections, cable infrastructure, PLC/HMI and commissioning support. The crew installed and connected the crane electrical systems and supported testing through to handover.

Défi

An outdoor port environment, heavy equipment interfaces and strict handover and testing requirements meant the crane electrical works had to be both robust and precisely documented for acceptance.

Rôle ARKTIS

Electrical installation and commissioning-support crew for the crane systems, executing to the manufacturer’s design and supporting site acceptance.

/ résultat

The crane electrical systems were prepared for testing, handover and site acceptance.

FAQ

Quels types de projets avez-vous réalisés ?+

Des lots électriques, mécaniques, d’automatisation et de mise en service sur data centers, usines EV et automobiles, centres de distribution automatisés, salles blanches et grues portuaires — pour Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz et Audi.

Pouvez-vous fournir des références ?+

Nos études de cas citent clients, sites et périmètres. Sur demande et dans le respect de la confidentialité, nous pouvons détailler des projets pertinents et vous mettre en relation lorsque le client l’autorise. Le capability pack offre un aperçu plus complet.

Comment les projets sont-ils documentés ?+

Chaque projet est livré avec les enregistrements QA/QC, journaux d’installation et plans as-built attendus par votre réception. Nous travaillons dans votre GED et vos conventions de nommage pour un bouclage prêt pour l’audit.

Besoin d’un scope similaire ?

Indiquez pays, scope et timing — réponse sous 48 heures.