ARKTIS.GROUP
← Références
Grue lourde · port FI · 2022–2023

Mantsinen

Pietarsaari / Jakobstad, Finland

Pays
Finland
Année
2022–2023
Équipe
3–6 specialists
Durée
4–8 weeks

Scope

Installation and commissioning of hydraulic harbour cranes with dual power/electric systems, plus operator-training and testing support. The crew installed and connected the crane systems and supported testing and operator handover.

Défi

Harbour-equipment installation in outdoor conditions, with heavy-lift interfaces and handover testing, required reliable systems and a thorough acceptance process before operational use.

Rôle ARKTIS

Electrical and commissioning-support crew for the harbour-crane systems, executing to the manufacturer’s design and supporting testing and training.

/ résultat

The crane systems were tested and prepared for operational use.

Besoin d’un scope similaire ?

Indiquez pays, scope et timing — réponse sous 48 heures.