Smagais celtnis · osta FI · 2022–2023

Mantsinen

Pietarsaari / Jakobstad, Finland

Valsts
Finland
Gads
2022–2023
Komanda
3–6 specialists
Ilgums
4–8 weeks

Apjoms

Installation and commissioning of hydraulic harbour cranes with dual power/electric systems, plus operator-training and testing support. The crew installed and connected the crane systems and supported testing and operator handover.

Izaicinājums

Harbour-equipment installation in outdoor conditions, with heavy-lift interfaces and handover testing, required reliable systems and a thorough acceptance process before operational use.

ARKTIS loma

Electrical and commissioning-support crew for the harbour-crane systems, executing to the manufacturer’s design and supporting testing and training.

/ rezultāts

The crane systems were tested and prepared for operational use.

FAQ

Kādus projektus esat realizējuši?+

Elektro, mehānikas, automatizācijas un nodošanas darbus datu centros, EV un autobūves rūpnīcās, automatizētos sadales centros, tīrtelpās un pie ostas celtņiem — Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz un Audi.

Vai varat sniegt atsauksmes?+

Mūsu gadījumu izpētes uzskaita klientus, vietas un apjomus. Pēc pieprasījuma un ievērojot konfidencialitāti, varam apspriest projektu detaļas un savienot jūs, kur klients to atļauj. Capability pack sniedz pilnīgāku pārskatu.

Kā projekti tiek dokumentēti?+

Katrs projekts tiek nodots ar QA/QC ierakstiem, montāžas žurnāliem un izpildrasējumiem, ko sagaida pieņemšana. Strādājam jūsu dokumentu pārvaldības sistēmā un nosaukumu konvencijās, lai noslēgums būtu gatavs auditam.

Vajag līdzīgu izpildi?

Pasakiet valsti, apjomu un laiku — atbildēsim 48 stundu laikā.