Smagais celtnis · osta DE · 2024

Liebherr

Brake, Germany

Valsts
Germany
Gads
2024
Komanda
3–6 specialists
Ilgums
4–8 weeks

Apjoms

Electrical installation and commissioning of a portal crane: e-drive, cable drum, video monitoring and control systems, with testing support. The crew installed and connected the drive and control systems and supported acceptance testing.

Izaicinājums

A port-crane delivery with electric-drive systems came with strict safety and acceptance requirements that the installation and testing had to satisfy before operation.

ARKTIS loma

Electrical installation and commissioning-support crew, executing to the manufacturer’s design and supporting the test and acceptance sequence.

/ rezultāts

The portal-crane systems were prepared for acceptance and operation.

FAQ

Kādus projektus esat realizējuši?+

Elektro, mehānikas, automatizācijas un nodošanas darbus datu centros, EV un autobūves rūpnīcās, automatizētos sadales centros, tīrtelpās un pie ostas celtņiem — Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz un Audi.

Vai varat sniegt atsauksmes?+

Mūsu gadījumu izpētes uzskaita klientus, vietas un apjomus. Pēc pieprasījuma un ievērojot konfidencialitāti, varam apspriest projektu detaļas un savienot jūs, kur klients to atļauj. Capability pack sniedz pilnīgāku pārskatu.

Kā projekti tiek dokumentēti?+

Katrs projekts tiek nodots ar QA/QC ierakstiem, montāžas žurnāliem un izpildrasējumiem, ko sagaida pieņemšana. Strādājam jūsu dokumentu pārvaldības sistēmā un nosaukumu konvencijās, lai noslēgums būtu gatavs auditam.

Vajag līdzīgu izpildi?

Pasakiet valsti, apjomu un laiku — atbildēsim 48 stundu laikā.