Smagais celtnis · offshore IT · 2024–2027
MELCAL / VARD Windward Offshore
Valsts
Italy
Gads
2024–2027
Komanda
3–6 specialists
Ilgums
4–8 weeks per vessel package
Apjoms
Installation support for boat-landing cranes across a multi-vessel programme: hydraulics, radio controls, safety systems, testing and commissioning support. The crew supported installation and acceptance of the crane systems package by package.
Izaicinājums
Marine and offshore equipment requires dependable safety systems and rigorous acceptance testing before each vessel is delivered, so every package had to meet the same standard.
ARKTIS loma
Crane electrical/controls installation and commissioning-support role, executing to the manufacturer’s design across successive vessel packages.
/ rezultāts
The crane systems were prepared for vessel handover and acceptance testing across the programme.
/ vairāk
Vairāk no šīs nozares
Vajag līdzīgu izpildi?
Pasakiet valsti, apjomu un laiku — atbildēsim 48 stundu laikā.