Raskekraana · offshore IT · 2024–2027
MELCAL / VARD Windward Offshore
Riik
Italy
Aasta
2024–2027
Meeskond
3–6 specialists
Kestus
4–8 weeks per vessel package
Maht
Installation support for boat-landing cranes across a multi-vessel programme: hydraulics, radio controls, safety systems, testing and commissioning support. The crew supported installation and acceptance of the crane systems package by package.
Väljakutse
Marine and offshore equipment requires dependable safety systems and rigorous acceptance testing before each vessel is delivered, so every package had to meet the same standard.
ARKTIS roll
Crane electrical/controls installation and commissioning-support role, executing to the manufacturer’s design across successive vessel packages.
/ tulemus
The crane systems were prepared for vessel handover and acceptance testing across the programme.