Raskekraana · offshore IT · 2024–2027

MELCAL / VARD Windward Offshore

Riik
Italy
Aasta
2024–2027
Meeskond
3–6 specialists
Kestus
4–8 weeks per vessel package

Maht

Installation support for boat-landing cranes across a multi-vessel programme: hydraulics, radio controls, safety systems, testing and commissioning support. The crew supported installation and acceptance of the crane systems package by package.

Väljakutse

Marine and offshore equipment requires dependable safety systems and rigorous acceptance testing before each vessel is delivered, so every package had to meet the same standard.

ARKTIS roll

Crane electrical/controls installation and commissioning-support role, executing to the manufacturer’s design across successive vessel packages.

/ tulemus

The crane systems were prepared for vessel handover and acceptance testing across the programme.