Grue lourde · offshore IT · 2024–2027

MELCAL / VARD Windward Offshore

Pays
Italy
Année
2024–2027
Équipe
3–6 specialists
Durée
4–8 weeks per vessel package

Scope

Installation support for boat-landing cranes across a multi-vessel programme: hydraulics, radio controls, safety systems, testing and commissioning support. The crew supported installation and acceptance of the crane systems package by package.

Défi

Marine and offshore equipment requires dependable safety systems and rigorous acceptance testing before each vessel is delivered, so every package had to meet the same standard.

Rôle ARKTIS

Crane electrical/controls installation and commissioning-support role, executing to the manufacturer’s design across successive vessel packages.

/ résultat

The crane systems were prepared for vessel handover and acceptance testing across the programme.