ARKTIS.GROUP
← Realizacje
Dźwig ciężki · offshore IT · 2024–2027

MELCAL / VARD Windward Offshore

Kraj
Italy
Rok
2024–2027
Brygada
3–6 specialists
Czas
4–8 weeks per vessel package

Zakres

Installation support for boat-landing cranes across a multi-vessel programme: hydraulics, radio controls, safety systems, testing and commissioning support. The crew supported installation and acceptance of the crane systems package by package.

Wyzwanie

Marine and offshore equipment requires dependable safety systems and rigorous acceptance testing before each vessel is delivered, so every package had to meet the same standard.

Rola ARKTIS

Crane electrical/controls installation and commissioning-support role, executing to the manufacturer’s design across successive vessel packages.

/ rezultat

The crane systems were prepared for vessel handover and acceptance testing across the programme.

Potrzebujesz podobnej realizacji?

Podaj kraj, zakres i termin — odpowiemy w 48 godzin.