Dźwig ciężki · offshore IT · 2024–2027
MELCAL / VARD Windward Offshore
Kraj
Italy
Rok
2024–2027
Brygada
3–6 specialists
Czas
4–8 weeks per vessel package
Zakres
Installation support for boat-landing cranes across a multi-vessel programme: hydraulics, radio controls, safety systems, testing and commissioning support. The crew supported installation and acceptance of the crane systems package by package.
Wyzwanie
Marine and offshore equipment requires dependable safety systems and rigorous acceptance testing before each vessel is delivered, so every package had to meet the same standard.
Rola ARKTIS
Crane electrical/controls installation and commissioning-support role, executing to the manufacturer’s design across successive vessel packages.
/ rezultat
The crane systems were prepared for vessel handover and acceptance testing across the programme.