Dźwig ciężki · port DE · 2024

Liebherr

Brake, Germany

Kraj
Germany
Rok
2024
Brygada
3–6 specialists
Czas
4–8 weeks

Zakres

Electrical installation and commissioning of a portal crane: e-drive, cable drum, video monitoring and control systems, with testing support. The crew installed and connected the drive and control systems and supported acceptance testing.

Wyzwanie

A port-crane delivery with electric-drive systems came with strict safety and acceptance requirements that the installation and testing had to satisfy before operation.

Rola ARKTIS

Electrical installation and commissioning-support crew, executing to the manufacturer’s design and supporting the test and acceptance sequence.

/ rezultat

The portal-crane systems were prepared for acceptance and operation.