Тяжёлый кран · порт DE · 2024

Liebherr

Brake, Germany

Страна
Germany
Год
2024
Бригада
3–6 specialists
Длительность
4–8 weeks

Скоуп

Electrical installation and commissioning of a portal crane: e-drive, cable drum, video monitoring and control systems, with testing support. The crew installed and connected the drive and control systems and supported acceptance testing.

Вызов

A port-crane delivery with electric-drive systems came with strict safety and acceptance requirements that the installation and testing had to satisfy before operation.

Роль ARKTIS

Electrical installation and commissioning-support crew, executing to the manufacturer’s design and supporting the test and acceptance sequence.

/ результат

The portal-crane systems were prepared for acceptance and operation.

FAQ

Какие проекты вы выполнили?+

Электромонтаж, механика, автоматизация и пусконаладка в дата-центрах, на заводах EV и автопрома, в автоматизированных распределительных центрах, чистых помещениях и на портовых кранах — для Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz, Audi и других.

Можете предоставить рекомендации?+

Наши кейсы содержат названия клиентов, локации и объёмы. По запросу и с учётом конфиденциальности мы обсудим детали проектов и свяжем вас, где клиент это разрешает. Capability pack даёт более полный обзор.

Как документируются проекты?+

Каждый проект сдаётся с записями QA/QC, журналами монтажа и исполнительными чертежами, которые ожидает приёмка. Мы работаем в вашей системе документооборота и соглашениях по именованию, чтобы закрытие было готово к аудиту.

Нужен похожий скоуп?

Скажите страну, скоуп и сроки — вернёмся в 48 часов.