Тяжёлый кран · порт DE · 2024–2025

Ardelt / Weserport

Bremen, Germany

Страна
Germany
Год
2024–2025
Бригада
4–8 specialists
Длительность
6–10 weeks

Скоуп

Electrical installation of Tukan K harbour-crane equipment: electrical container, drive and control connections, cable infrastructure, PLC/HMI and commissioning support. The crew installed and connected the crane electrical systems and supported testing through to handover.

Вызов

An outdoor port environment, heavy equipment interfaces and strict handover and testing requirements meant the crane electrical works had to be both robust and precisely documented for acceptance.

Роль ARKTIS

Electrical installation and commissioning-support crew for the crane systems, executing to the manufacturer’s design and supporting site acceptance.

/ результат

The crane electrical systems were prepared for testing, handover and site acceptance.