Automotive tootmine SK · 2011–2013

Volkswagen Slovakia

Bratislava, Slovakia

Riik
Slovakia
Aasta
2011–2013
Meeskond
8–15 specialists
Kestus
3–5 months

Maht

Electrical infrastructure for production halls: lighting, busbars, cable trays, grounding, lightning protection and distribution cabinets. The crew installed the hall power and protection systems across multiple production areas.

Väljakutse

Large-scale plant infrastructure work required coordination across press, paint and production areas so the electrical systems came together consistently across the whole site.

ARKTIS roll

Electrical infrastructure subcontractor for the industrial power and plant systems, executing to the client design across the production halls.

/ tulemus

The production areas were supplied with the electrical infrastructure required for operation.