Automotive tootmine SK · 2011–2013
Volkswagen Slovakia
Bratislava, Slovakia
Riik
Slovakia
Aasta
2011–2013
Meeskond
8–15 specialists
Kestus
3–5 months
Maht
Electrical infrastructure for production halls: lighting, busbars, cable trays, grounding, lightning protection and distribution cabinets. The crew installed the hall power and protection systems across multiple production areas.
Väljakutse
Large-scale plant infrastructure work required coordination across press, paint and production areas so the electrical systems came together consistently across the whole site.
ARKTIS roll
Electrical infrastructure subcontractor for the industrial power and plant systems, executing to the client design across the production halls.
/ tulemus
The production areas were supplied with the electrical infrastructure required for operation.