Automotive · testimine GB · 2025

Jaguar Land Rover

Birmingham, United Kingdom

Riik
United Kingdom
Aasta
2025
Meeskond
2–5 specialists
Kestus
2–6 weeks

Maht

Electrical installation of testing equipment: connection of testing technologies and commissioning support. The crew installed and connected the equipment and supported the validation set-up with accurate documentation.

Väljakutse

Testing equipment depends on reliable signal and power connections and precise commissioning documentation, so accuracy of the connections and records mattered more than volume of work.

ARKTIS roll

Electrical installation crew for the testing technologies, executing to the client specification and supporting commissioning and validation.

/ tulemus

The testing equipment was connected and prepared for validation.

KKK

Milliseid projekte olete teostanud?+

Elektri-, mehaanika-, automaatika- ja kasutuselevõtu töid andmekeskustes, EV ja autotehastes, automatiseeritud jaotuskeskustes, puhtaruumides ja sadamakraanadel — Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz ja Audi.

Kas saate esitada referentse?+

Meie juhtumiuuringud loetlevad kliendid, asukohad ja mahud. Soovi korral ja konfidentsiaalsust arvestades arutame projektide detaile ja ühendame teid, kui klient lubab. Capability pack annab põhjalikuma ülevaate.

Kuidas projekte dokumenteeritakse?+

Iga projekt antakse üle QA/QC kirjete, paigalduslogide ja teostusjoonistega, mida vastuvõtt ootab. Töötame teie dokumendihaldussüsteemis ja nimekonventsioonides, et lõpetamine oleks auditivalmis.

Vajate sarnast teostust?

Öelge riik, maht ja aeg — vastame 48 tunni jooksul.