Automotive · испытания GB · 2025

Jaguar Land Rover

Birmingham, United Kingdom

Страна
United Kingdom
Год
2025
Бригада
2–5 specialists
Длительность
2–6 weeks

Скоуп

Electrical installation of testing equipment: connection of testing technologies and commissioning support. The crew installed and connected the equipment and supported the validation set-up with accurate documentation.

Вызов

Testing equipment depends on reliable signal and power connections and precise commissioning documentation, so accuracy of the connections and records mattered more than volume of work.

Роль ARKTIS

Electrical installation crew for the testing technologies, executing to the client specification and supporting commissioning and validation.

/ результат

The testing equipment was connected and prepared for validation.

FAQ

Какие проекты вы выполнили?+

Электромонтаж, механика, автоматизация и пусконаладка в дата-центрах, на заводах EV и автопрома, в автоматизированных распределительных центрах, чистых помещениях и на портовых кранах — для Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz, Audi и других.

Можете предоставить рекомендации?+

Наши кейсы содержат названия клиентов, локации и объёмы. По запросу и с учётом конфиденциальности мы обсудим детали проектов и свяжем вас, где клиент это разрешает. Capability pack даёт более полный обзор.

Как документируются проекты?+

Каждый проект сдаётся с записями QA/QC, журналами монтажа и исполнительными чертежами, которые ожидает приёмка. Мы работаем в вашей системе документооборота и соглашениях по именованию, чтобы закрытие было готово к аудиту.

Нужен похожий скоуп?

Скажите страну, скоуп и сроки — вернёмся в 48 часов.