BMW Plant Debrecen
Debrecen, Hungary
Maht
Electrical installation for a new EV plant: power supply, technology lines, assembly equipment and start-up preparation. Crews installed and connected the plant infrastructure and production-line equipment and supported readiness for start-up across the greenfield build.
Väljakutse
A greenfield EV plant build meant a fast ramp-up, heavy multi-contractor coordination and fixed launch deadlines, so the electrical works had to keep pace with parallel trades on a live construction programme.
ARKTIS roll
Electrical installation subcontractor supporting plant infrastructure and production-line readiness, executing to the client design and coordinating with the broader site programme.
/ tulemus
Plant infrastructure and line equipment were installed and prepared for start-up and commissioning within the launch schedule.
/ rohkem
Rohkem sellest sektorist
KKK
Milliseid projekte olete teostanud?+
Elektri-, mehaanika-, automaatika- ja kasutuselevõtu töid andmekeskustes, EV ja autotehastes, automatiseeritud jaotuskeskustes, puhtaruumides ja sadamakraanadel — Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz ja Audi.
Kas saate esitada referentse?+
Meie juhtumiuuringud loetlevad kliendid, asukohad ja mahud. Soovi korral ja konfidentsiaalsust arvestades arutame projektide detaile ja ühendame teid, kui klient lubab. Capability pack annab põhjalikuma ülevaate.
Kuidas projekte dokumenteeritakse?+
Iga projekt antakse üle QA/QC kirjete, paigalduslogide ja teostusjoonistega, mida vastuvõtt ootab. Töötame teie dokumendihaldussüsteemis ja nimekonventsioonides, et lõpetamine oleks auditivalmis.