Automotive manufacturing SK · 2011–2013
Volkswagen Slovakia
Bratislava, Slovakia
Country
Slovakia
Year
2011–2013
Team
8–15 specialists
Duration
3–5 months
Scope
Electrical infrastructure for production halls: lighting, busbars, cable trays, grounding, lightning protection and distribution cabinets. The crew installed the hall power and protection systems across multiple production areas.
Challenge
Large-scale plant infrastructure work required coordination across press, paint and production areas so the electrical systems came together consistently across the whole site.
ARKTIS role
Electrical infrastructure subcontractor for the industrial power and plant systems, executing to the client design across the production halls.
/ result
The production areas were supplied with the electrical infrastructure required for operation.