ARKTIS.GROUP
← Realizācijas
Automotive ražošana SK · 2011–2013

Volkswagen Slovakia

Bratislava, Slovakia

Valsts
Slovakia
Gads
2011–2013
Komanda
8–15 specialists
Ilgums
3–5 months

Apjoms

Electrical infrastructure for production halls: lighting, busbars, cable trays, grounding, lightning protection and distribution cabinets. The crew installed the hall power and protection systems across multiple production areas.

Izaicinājums

Large-scale plant infrastructure work required coordination across press, paint and production areas so the electrical systems came together consistently across the whole site.

ARKTIS loma

Electrical infrastructure subcontractor for the industrial power and plant systems, executing to the client design across the production halls.

/ rezultāts

The production areas were supplied with the electrical infrastructure required for operation.

FAQ

Kādus projektus esat realizējuši?+

Elektro, mehānikas, automatizācijas un nodošanas darbus datu centros, EV un autobūves rūpnīcās, automatizētos sadales centros, tīrtelpās un pie ostas celtņiem — Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz un Audi.

Vai varat sniegt atsauksmes?+

Mūsu gadījumu izpētes uzskaita klientus, vietas un apjomus. Pēc pieprasījuma un ievērojot konfidencialitāti, varam apspriest projektu detaļas un savienot jūs, kur klients to atļauj. Capability pack sniedz pilnīgāku pārskatu.

Kā projekti tiek dokumentēti?+

Katrs projekts tiek nodots ar QA/QC ierakstiem, montāžas žurnāliem un izpildrasējumiem, ko sagaida pieņemšana. Strādājam jūsu dokumentu pārvaldības sistēmā un nosaukumu konvencijās, lai noslēgums būtu gatavs auditam.

Vajag līdzīgu izpildi?

Pasakiet valsti, apjomu un laiku — atbildēsim 48 stundu laikā.