ARKTIS.GROUP
← Atvejai
Automotive gamyba SK · 2011–2013

Volkswagen Slovakia

Bratislava, Slovakia

Šalis
Slovakia
Metai
2011–2013
Komanda
8–15 specialists
Trukmė
3–5 months

Apimtis

Electrical infrastructure for production halls: lighting, busbars, cable trays, grounding, lightning protection and distribution cabinets. The crew installed the hall power and protection systems across multiple production areas.

Iššūkis

Large-scale plant infrastructure work required coordination across press, paint and production areas so the electrical systems came together consistently across the whole site.

ARKTIS vaidmuo

Electrical infrastructure subcontractor for the industrial power and plant systems, executing to the client design across the production halls.

/ rezultatas

The production areas were supplied with the electrical infrastructure required for operation.

DUK

Kokius projektus įgyvendinote?+

Elektros, mechanikos, automatikos ir paleidimo darbus duomenų centruose, EV ir automobilių gamyklose, automatizuotuose paskirstymo centruose, švariose patalpose ir prie uosto kranų — Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz ir Audi.

Ar galite pateikti rekomendacijų?+

Mūsų atvejų analizės nurodo klientus, vietas ir apimtis. Paprašius ir laikantis konfidencialumo, galime aptarti projektų detales ir sujungti jus, kur klientas leidžia. Capability pack pateikia išsamesnę apžvalgą.

Kaip dokumentuojami projektai?+

Kiekvienas projektas perduodamas su QA/QC įrašais, montavimo žurnalais ir vykdomaisiais brėžiniais, kurių tikisi priėmimas. Dirbame jūsų dokumentų valdymo sistemoje ir pavadinimų konvencijose, kad užbaigimas būtų paruoštas auditui.

Reikia panašaus vykdymo?

Pasakykite šalį, apimtį ir laiką — atsakysime per 48 valandas.