Automotive · EV BE · 2020–2022

Volvo Cars Ghent

Ghent, Belgium

Šalis
Belgium
Metai
2020–2022
Komanda
6–10 specialists
Trukmė
2–3 months

Apimtis

Electrical installation of production and EV lines: equipment connection, cable routes, control cabinets, testing and commissioning support. The crew connected the line equipment within an established plant and supported the move to commissioning.

Iššūkis

An EV production ramp-up inside an established automotive plant left only tight production-change windows in which to install and connect the new line equipment.

ARKTIS vaidmuo

Electrical installation subcontractor for the production-line equipment, executing to the client design and working within the plant’s change and shutdown windows.

/ rezultatas

The production equipment was connected and made ready for commissioning and ramp-up.

DUK

Kokius projektus įgyvendinote?+

Elektros, mechanikos, automatikos ir paleidimo darbus duomenų centruose, EV ir automobilių gamyklose, automatizuotuose paskirstymo centruose, švariose patalpose ir prie uosto kranų — Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz ir Audi.

Ar galite pateikti rekomendacijų?+

Mūsų atvejų analizės nurodo klientus, vietas ir apimtis. Paprašius ir laikantis konfidencialumo, galime aptarti projektų detales ir sujungti jus, kur klientas leidžia. Capability pack pateikia išsamesnę apžvalgą.

Kaip dokumentuojami projektai?+

Kiekvienas projektas perduodamas su QA/QC įrašais, montavimo žurnalais ir vykdomaisiais brėžiniais, kurių tikisi priėmimas. Dirbame jūsų dokumentų valdymo sistemoje ir pavadinimų konvencijose, kad užbaigimas būtų paruoštas auditui.

Reikia panašaus vykdymo?

Pasakykite šalį, apimtį ir laiką — atsakysime per 48 valandas.