Electrical installation of production and EV lines: equipment connection, cable routes, control cabinets, testing and commissioning support. The crew connected the line equipment within an established plant and supported the move to commissioning.
Défi
An EV production ramp-up inside an established automotive plant left only tight production-change windows in which to install and connect the new line equipment.
Rôle ARKTIS
Electrical installation subcontractor for the production-line equipment, executing to the client design and working within the plant’s change and shutdown windows.
/ résultat
The production equipment was connected and made ready for commissioning and ramp-up.