Volvo Cars Ghent
Ghent, Belgium
Scope
Electrical installation of production and EV lines: equipment connection, cable routes, control cabinets, testing and commissioning support. The crew connected the line equipment within an established plant and supported the move to commissioning.
Herausforderung
An EV production ramp-up inside an established automotive plant left only tight production-change windows in which to install and connect the new line equipment.
ARKTIS-Rolle
Electrical installation subcontractor for the production-line equipment, executing to the client design and working within the plant’s change and shutdown windows.
/ ergebnis
The production equipment was connected and made ready for commissioning and ramp-up.
/ weitere
Weitere aus dieser Branche
FAQ
Welche Projekte haben Sie umgesetzt?+
Elektro-, Mechanik-, Automations- und Inbetriebnahme-Gewerke in Rechenzentren, EV- und Automobilwerken, automatisierten Verteilzentren, Reinräumen und an Hafenkranen — u. a. für Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz und Audi.
Können Sie Referenzen nennen?+
Unsere Case Studies nennen Kunden, Standorte und Gewerke. Auf Anfrage und unter Wahrung der Vertraulichkeit besprechen wir relevante Projektdetails und stellen Kontakt her, wo der Kunde es erlaubt. Das Capability Pack bietet einen umfassenderen Überblick.
Wie werden Projekte dokumentiert?+
Jedes Projekt wird mit QA/QC-Nachweisen, Installationsprotokollen und As-built-Redlines übergeben, die Ihr Abnahmeprozess erwartet. Wir arbeiten in Ihrem Dokumentenmanagementsystem und Ihren Namenskonventionen, damit der Abschluss audit-fähig ist.
Brauchen Sie eine ähnliche Umsetzung?
Nennen Sie Land, Scope und Zeitfenster — Rückmeldung innerhalb von 48 Stunden.