Automotive · EV BE · 2020–2022
Volvo Cars Ghent
Ghent, Belgium
Land
Belgium
Jaar
2020–2022
Ploeg
6–10 specialists
Duur
2–3 months
Scope
Electrical installation of production and EV lines: equipment connection, cable routes, control cabinets, testing and commissioning support. The crew connected the line equipment within an established plant and supported the move to commissioning.
Uitdaging
An EV production ramp-up inside an established automotive plant left only tight production-change windows in which to install and connect the new line equipment.
ARKTIS-rol
Electrical installation subcontractor for the production-line equipment, executing to the client design and working within the plant’s change and shutdown windows.
/ resultaat
The production equipment was connected and made ready for commissioning and ramp-up.