Produkcja automotive SK · 2011–2013
Volkswagen Slovakia
Bratislava, Slovakia
Kraj
Slovakia
Rok
2011–2013
Brygada
8–15 specialists
Czas
3–5 months
Zakres
Electrical infrastructure for production halls: lighting, busbars, cable trays, grounding, lightning protection and distribution cabinets. The crew installed the hall power and protection systems across multiple production areas.
Wyzwanie
Large-scale plant infrastructure work required coordination across press, paint and production areas so the electrical systems came together consistently across the whole site.
Rola ARKTIS
Electrical infrastructure subcontractor for the industrial power and plant systems, executing to the client design across the production halls.
/ rezultat
The production areas were supplied with the electrical infrastructure required for operation.