Fabrication automobile SK · 2011–2013
Volkswagen Slovakia
Bratislava, Slovakia
Pays
Slovakia
Année
2011–2013
Équipe
8–15 specialists
Durée
3–5 months
Scope
Electrical infrastructure for production halls: lighting, busbars, cable trays, grounding, lightning protection and distribution cabinets. The crew installed the hall power and protection systems across multiple production areas.
Défi
Large-scale plant infrastructure work required coordination across press, paint and production areas so the electrical systems came together consistently across the whole site.
Rôle ARKTIS
Electrical infrastructure subcontractor for the industrial power and plant systems, executing to the client design across the production halls.
/ résultat
The production areas were supplied with the electrical infrastructure required for operation.