Fabrication automobile DE · 2019

Mercedes-Benz Plant Düsseldorf

Düsseldorf, Germany

Pays
Germany
Année
2019
Équipe
6–10 specialists
Durée
6–10 weeks

Scope

Electrical installation and connection of production infrastructure and line equipment: cable routes, power supply, production stations and testing support. The crew installed and connected the line infrastructure inside an active van-production plant.

Défi

Working inside an active van-production plant imposed strict safety, access and shutdown-window constraints, so the installation had to progress in short windows without disrupting production.

Rôle ARKTIS

Electrical installation subcontractor and site crew for the production-line infrastructure, executing to the client design within the plant’s safety and access regime.

/ résultat

The production equipment was connected and prepared for integration with plant operations.

FAQ

Quels types de projets avez-vous réalisés ?+

Des lots électriques, mécaniques, d’automatisation et de mise en service sur data centers, usines EV et automobiles, centres de distribution automatisés, salles blanches et grues portuaires — pour Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz et Audi.

Pouvez-vous fournir des références ?+

Nos études de cas citent clients, sites et périmètres. Sur demande et dans le respect de la confidentialité, nous pouvons détailler des projets pertinents et vous mettre en relation lorsque le client l’autorise. Le capability pack offre un aperçu plus complet.

Comment les projets sont-ils documentés ?+

Chaque projet est livré avec les enregistrements QA/QC, journaux d’installation et plans as-built attendus par votre réception. Nous travaillons dans votre GED et vos conventions de nommage pour un bouclage prêt pour l’audit.