ARKTIS.GROUP
← Referenzen
Automobilfertigung DE · 2019

Mercedes-Benz Plant Düsseldorf

Düsseldorf, Germany

Land
Germany
Jahr
2019
Team
6–10 specialists
Dauer
6–10 weeks

Scope

Electrical installation and connection of production infrastructure and line equipment: cable routes, power supply, production stations and testing support. The crew installed and connected the line infrastructure inside an active van-production plant.

Herausforderung

Working inside an active van-production plant imposed strict safety, access and shutdown-window constraints, so the installation had to progress in short windows without disrupting production.

ARKTIS-Rolle

Electrical installation subcontractor and site crew for the production-line infrastructure, executing to the client design within the plant’s safety and access regime.

/ ergebnis

The production equipment was connected and prepared for integration with plant operations.

Brauchen Sie eine ähnliche Umsetzung?

Nennen Sie Land, Scope und Zeitfenster — Rückmeldung innerhalb von 48 Stunden.