ARKTIS.GROUP
← Realizācijas
Automotive ražošana DE · 2019

Mercedes-Benz Plant Düsseldorf

Düsseldorf, Germany

Valsts
Germany
Gads
2019
Komanda
6–10 specialists
Ilgums
6–10 weeks

Apjoms

Electrical installation and connection of production infrastructure and line equipment: cable routes, power supply, production stations and testing support. The crew installed and connected the line infrastructure inside an active van-production plant.

Izaicinājums

Working inside an active van-production plant imposed strict safety, access and shutdown-window constraints, so the installation had to progress in short windows without disrupting production.

ARKTIS loma

Electrical installation subcontractor and site crew for the production-line infrastructure, executing to the client design within the plant’s safety and access regime.

/ rezultāts

The production equipment was connected and prepared for integration with plant operations.

FAQ

Kādus projektus esat realizējuši?+

Elektro, mehānikas, automatizācijas un nodošanas darbus datu centros, EV un autobūves rūpnīcās, automatizētos sadales centros, tīrtelpās un pie ostas celtņiem — Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz un Audi.

Vai varat sniegt atsauksmes?+

Mūsu gadījumu izpētes uzskaita klientus, vietas un apjomus. Pēc pieprasījuma un ievērojot konfidencialitāti, varam apspriest projektu detaļas un savienot jūs, kur klients to atļauj. Capability pack sniedz pilnīgāku pārskatu.

Kā projekti tiek dokumentēti?+

Katrs projekts tiek nodots ar QA/QC ierakstiem, montāžas žurnāliem un izpildrasējumiem, ko sagaida pieņemšana. Strādājam jūsu dokumentu pārvaldības sistēmā un nosaukumu konvencijās, lai noslēgums būtu gatavs auditam.

Vajag līdzīgu izpildi?

Pasakiet valsti, apjomu un laiku — atbildēsim 48 stundu laikā.