Автомобильное производство DE · 2019

Mercedes-Benz Plant Düsseldorf

Düsseldorf, Germany

Страна
Germany
Год
2019
Бригада
6–10 specialists
Длительность
6–10 weeks

Скоуп

Electrical installation and connection of production infrastructure and line equipment: cable routes, power supply, production stations and testing support. The crew installed and connected the line infrastructure inside an active van-production plant.

Вызов

Working inside an active van-production plant imposed strict safety, access and shutdown-window constraints, so the installation had to progress in short windows without disrupting production.

Роль ARKTIS

Electrical installation subcontractor and site crew for the production-line infrastructure, executing to the client design within the plant’s safety and access regime.

/ результат

The production equipment was connected and prepared for integration with plant operations.

FAQ

Какие проекты вы выполнили?+

Электромонтаж, механика, автоматизация и пусконаладка в дата-центрах, на заводах EV и автопрома, в автоматизированных распределительных центрах, чистых помещениях и на портовых кранах — для Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz, Audi и других.

Можете предоставить рекомендации?+

Наши кейсы содержат названия клиентов, локации и объёмы. По запросу и с учётом конфиденциальности мы обсудим детали проектов и свяжем вас, где клиент это разрешает. Capability pack даёт более полный обзор.

Как документируются проекты?+

Каждый проект сдаётся с записями QA/QC, журналами монтажа и исполнительными чертежами, которые ожидает приёмка. Мы работаем в вашей системе документооборота и соглашениях по именованию, чтобы закрытие было готово к аудиту.

Нужен похожий скоуп?

Скажите страну, скоуп и сроки — вернёмся в 48 часов.