Automotive tootmine DE · 2020

Mercedes-Benz Sindelfingen / Factory 56

Sindelfingen, Germany

Riik
Germany
Aasta
2020
Meeskond
8–14 specialists
Kestus
2–4 months

Maht

Electrical installation of flexible-assembly infrastructure: conveyor elements, AGV and material-flow systems, production stations and commissioning support. The crew installed and connected the material-handling infrastructure supporting the flexible factory concept.

Väljakutse

A high-flexibility factory concept relies on synchronized material flow and strict launch timing, so the AGV and conveyor infrastructure had to be installed and proven to a tight schedule.

ARKTIS roll

Electrical installation subcontractor supporting the flexible-assembly and material-handling systems, executing to the client design within the launch programme.

/ tulemus

The flexible-assembly infrastructure was connected and prepared for launch and commissioning.