Automotive-productie DE · 2020

Mercedes-Benz Sindelfingen / Factory 56

Sindelfingen, Germany

Land
Germany
Jaar
2020
Ploeg
8–14 specialists
Duur
2–4 months

Scope

Electrical installation of flexible-assembly infrastructure: conveyor elements, AGV and material-flow systems, production stations and commissioning support. The crew installed and connected the material-handling infrastructure supporting the flexible factory concept.

Uitdaging

A high-flexibility factory concept relies on synchronized material flow and strict launch timing, so the AGV and conveyor infrastructure had to be installed and proven to a tight schedule.

ARKTIS-rol

Electrical installation subcontractor supporting the flexible-assembly and material-handling systems, executing to the client design within the launch programme.

/ resultaat

The flexible-assembly infrastructure was connected and prepared for launch and commissioning.