Mercedes-Benz Sindelfingen / Factory 56
Sindelfingen, Germany
Scope
Electrical installation of flexible-assembly infrastructure: conveyor elements, AGV and material-flow systems, production stations and commissioning support. The crew installed and connected the material-handling infrastructure supporting the flexible factory concept.
Défi
A high-flexibility factory concept relies on synchronized material flow and strict launch timing, so the AGV and conveyor infrastructure had to be installed and proven to a tight schedule.
Rôle ARKTIS
Electrical installation subcontractor supporting the flexible-assembly and material-handling systems, executing to the client design within the launch programme.
/ résultat
The flexible-assembly infrastructure was connected and prepared for launch and commissioning.
/ plus
Plus dans ce secteur
FAQ
Quels types de projets avez-vous réalisés ?+
Des lots électriques, mécaniques, d’automatisation et de mise en service sur data centers, usines EV et automobiles, centres de distribution automatisés, salles blanches et grues portuaires — pour Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz et Audi.
Pouvez-vous fournir des références ?+
Nos études de cas citent clients, sites et périmètres. Sur demande et dans le respect de la confidentialité, nous pouvons détailler des projets pertinents et vous mettre en relation lorsque le client l’autorise. Le capability pack offre un aperçu plus complet.
Comment les projets sont-ils documentés ?+
Chaque projet est livré avec les enregistrements QA/QC, journaux d’installation et plans as-built attendus par votre réception. Nous travaillons dans votre GED et vos conventions de nommage pour un bouclage prêt pour l’audit.
Besoin d’un scope similaire ?
Indiquez pays, scope et timing — réponse sous 48 heures.