Automotive tootmine DE · 2018–2019
Mercedes-Benz Plant Rastatt
Rastatt, Germany
Riik
Germany
Aasta
2018–2019
Meeskond
6–12 specialists
Kestus
2–3 months
Maht
Electrical installation of production lines and connection and integration of equipment into an active manufacturing environment. The crew installed and integrated the line equipment while existing production continued around the works.
Väljakutse
A brownfield integration demanded minimal disruption to existing production while meeting OEM quality standards, so the works were planned to fit around live manufacturing.
ARKTIS roll
Electrical installation and integration crew for the line equipment, executing to the client design within the running plant.
/ tulemus
The installed systems were prepared for commissioning and production readiness.