Automotive-productie DE · 2018–2019
Mercedes-Benz Plant Rastatt
Rastatt, Germany
Land
Germany
Jaar
2018–2019
Ploeg
6–12 specialists
Duur
2–3 months
Scope
Electrical installation of production lines and connection and integration of equipment into an active manufacturing environment. The crew installed and integrated the line equipment while existing production continued around the works.
Uitdaging
A brownfield integration demanded minimal disruption to existing production while meeting OEM quality standards, so the works were planned to fit around live manufacturing.
ARKTIS-rol
Electrical installation and integration crew for the line equipment, executing to the client design within the running plant.
/ resultaat
The installed systems were prepared for commissioning and production readiness.