ARKTIS.GROUP

/ проекты

Свежие проекты

Выборка проектов, реализованных бригадами ARKTIS.GROUP для OEM, операторов дата-центров, интеграторов интралогистики и производителей портового оборудования.

Проектов
28
Стран
14
Период
20112027
Дата-центрDE · 2021–2022

Vantage Data Centers

Berlin, Germany

Data centre MEP and electrical installation across critical-power and distribution systems — MDP/SDP panels, UPS, ATS, standby generators, cable containment and BMS/EPMS — through to commissioning support. Crews installed, terminated and tested the power chain to the project specification and kept the installation records current for each system as it was handed to commissioning.

Бригада 8–16 specialistsДлительность 3–6 months
Дата-центрES · 2022 · expansion 2024+

AWS Spain Region

Aragon, Spain

Electrical installation for cloud data-centre infrastructure: power distribution, UPS/ATS, standby generation, cable containment, BMS/EPMS and server/network white-space fit-out. The crew scaled across multiple buildings as the region expanded, holding a consistent installation and documentation standard across each phase.

Бригада 8–20 specialistsДлительность 3–6 months
Дата-центрDE · 2023–2024

Equinix

Frankfurt, Germany

Critical-equipment installation, CSA/MEP works and commissioning support across data halls and white-space infrastructure. Crews installed and connected critical systems and supported the staged commissioning sequence while live operations continued elsewhere on the campus.

Бригада 8–16 specialistsДлительность 3–6 months
Дата-центрDE · 2019

Mercury Engineering / FRA10

Frankfurt, Germany

MEP and data-centre works covering HV/LV distribution, backup generation with PLC control, life-safety and security systems, plant rooms and commissioning support. The crew installed and connected the power and safety systems and supported testing through to handover.

Бригада 8–16 specialistsДлительность 3–6 months
ИнтралогистикаDE · 2022–2025

WITRON / EDEKA Nord

Neumünster, Germany

Electrical installation for a fully automated grocery distribution centre: OPM/COM order-picking machines, stacker cranes, conveyor systems and IT/control integration, with ongoing maintenance support. Crews wired and connected the automation equipment and supported integration with the WITRON control platform across a multi-year build.

Бригада 8–16 specialistsДлительность 3–6 months
Интралогистика · авиа каргоLV · 2024–2025

airBaltic Baltic Cargo Hub

Riga, Latvia

Electrical installation for material-handling systems, temperature-controlled zones, warehouse automation and engineering networks at an air-cargo hub. The crew installed and connected the handling and building systems and supported the move toward operational launch.

Бригада 4–8 specialistsДлительность 2–4 months
Интралогистика · fashionES · 2023–2024

Tendam Logistics Centre

Illescas, Spain

Electrical installation of fashion-logistics warehouse automation: pouch sorter, miniload, conveyor zones, packing and dispatch areas and equipment connections. Crews connected the automation across the picking-to-dispatch flow and supported phased start-up.

Бригада 6–12 specialistsДлительность 2–4 months
ИнтралогистикаES · 2023–2024

Dematic / Tendam

Illescas, Spain

Warehouse automation electrical works for the Dematic package: conveyor systems, shuttle/miniload, sortation, packing zones, control cabinets and commissioning support. The crew installed and wired the equipment and control cabinets and supported the staged ramp-up.

Бригада 6–12 specialistsДлительность 2–4 months
Интралогистика · retailCA · 2020–2024

Vanderlande / Walmart Canada

Vaughan, Ontario, Canada

Electrical works for STOREPICK/ADAPTO retail automation: shuttle systems, conveyors, warehouse automation and supporting software integration through to commissioning. The crew connected the automation equipment and supported the move toward operational ramp-up.

Бригада 6–12 specialistsДлительность 2–4 months
Интралогистика · e-commerceNL · 2019–2021

bol.com Fulfilment Center

Waalwijk, Netherlands

Electrical installation of automated warehouse systems for an e-commerce fulfilment centre: conveyors, sorters, shuttle/miniload zones, control cabinets, sensors and cable routes. Crews installed and connected the equipment across the material-flow system and supported commissioning.

Бригада 8–14 specialistsДлительность 3–5 months
Интралогистика · e-commerceUS · 2026–2027

Walmart Fulfillment Center

Kings Mountain / Charlotte area, NC, USA

Probable scope: electrical installation for fulfilment-centre automation — power distribution, conveyors, equipment connections and commissioning support. Exact scope to be confirmed against internal records.

Бригада 6–12 specialists (to confirm)Длительность 2–4 months (to confirm)
на уточнении
Интралогистика · retailUS · 2022–2024

Walmart Distribution Center

Pittston, PA, USA

Probable scope: electrical installation for warehouse automation/robotics — conveyors, sorting, equipment power, control cabinets and commissioning support. Exact scope to be confirmed against internal records.

Бригада 6–12 specialists (to confirm)Длительность 2–4 months (to confirm)
на уточнении
Автомобильная интралогистикаMX · 2019–2020

Lödige Industries / BMW San Luis Potosí

San Luis Potosí, Mexico

Electrical works for automated storage and buffer systems: racking, stacker cranes, conveyors, automation, lighting and building services. The crew installed and connected the storage and conveyor equipment supporting in-sequence body delivery.

Бригада 6–12 specialistsДлительность 2–4 months
Интралогистика · автозапчастиCH · 2016

Swisslog / AMAG

Buchs / Lupfig, Switzerland

Intralogistics support covering integration, maintenance and monitoring of automated warehouse systems for an automotive spare-parts operation. The crew supported the installed automation and helped sustain reliable storage and retrieval operation.

Бригада 3–6 specialistsДлительность 4–8 weeks
Automotive · EVHU · 2023–2025

BMW Plant Debrecen

Debrecen, Hungary

Electrical installation for a new EV plant: power supply, technology lines, assembly equipment and start-up preparation. Crews installed and connected the plant infrastructure and production-line equipment and supported readiness for start-up across the greenfield build.

Бригада 8–16 specialistsДлительность 3–6 months
Automotive · EVBE · 2020–2022

Volvo Cars Ghent

Ghent, Belgium

Electrical installation of production and EV lines: equipment connection, cable routes, control cabinets, testing and commissioning support. The crew connected the line equipment within an established plant and supported the move to commissioning.

Бригада 6–10 specialistsДлительность 2–3 months
Automotive · испытанияGB · 2025

Jaguar Land Rover

Birmingham, United Kingdom

Electrical installation of testing equipment: connection of testing technologies and commissioning support. The crew installed and connected the equipment and supported the validation set-up with accurate documentation.

Бригада 2–5 specialistsДлительность 2–6 weeks
Автомобильное производствоDE · 2023

Audi / Volkswagen Group Ingolstadt

Ingolstadt, Germany

Electrical and controls installation: control cabinets, PLC/HMI wiring, robotic-cell connections and sealer/material-handling line support. The crew wired and connected the robotic and material-handling equipment to OEM standards and supported testing.

Бригада 4–8 specialistsДлительность 4–8 weeks
Автомобильное производствоDE · 2021

BMW Dingolfing

Dingolfing, Germany

Electrical installation for production logistics, conveyor and transport systems and equipment for electrified-vehicle production. The crew installed and connected the logistics and transport equipment inside a large running plant.

Бригада 6–12 specialistsДлительность 2–3 months
Автомобильное производствоDE · 2020

Mercedes-Benz Sindelfingen / Factory 56

Sindelfingen, Germany

Electrical installation of flexible-assembly infrastructure: conveyor elements, AGV and material-flow systems, production stations and commissioning support. The crew installed and connected the material-handling infrastructure supporting the flexible factory concept.

Бригада 8–14 specialistsДлительность 2–4 months
Автомобильное производствоDE · 2019

Mercedes-Benz Plant Düsseldorf

Düsseldorf, Germany

Electrical installation and connection of production infrastructure and line equipment: cable routes, power supply, production stations and testing support. The crew installed and connected the line infrastructure inside an active van-production plant.

Бригада 6–10 specialistsДлительность 6–10 weeks
Автомобильное производствоDE · 2018–2019

Mercedes-Benz Plant Rastatt

Rastatt, Germany

Electrical installation of production lines and connection and integration of equipment into an active manufacturing environment. The crew installed and integrated the line equipment while existing production continued around the works.

Бригада 6–12 specialistsДлительность 2–3 months
Автомобильное производствоDE · 2016

Audi Neckarsulm

Neckarsulm, Germany

Electrical installation of production systems: cable trays, power and signal cables, communication networks, LV cabinets, lighting, UPS and grounding. The crew installed the full plant electrical scope and prepared it for acceptance.

Бригада 6–10 specialistsДлительность 2–3 months
Автомобильное производствоSK · 2011–2013

Volkswagen Slovakia

Bratislava, Slovakia

Electrical infrastructure for production halls: lighting, busbars, cable trays, grounding, lightning protection and distribution cabinets. The crew installed the hall power and protection systems across multiple production areas.

Бригада 8–15 specialistsДлительность 3–5 months
Тяжёлый кран · портDE · 2024–2025

Ardelt / Weserport

Bremen, Germany

Electrical installation of Tukan K harbour-crane equipment: electrical container, drive and control connections, cable infrastructure, PLC/HMI and commissioning support. The crew installed and connected the crane electrical systems and supported testing through to handover.

Бригада 4–8 specialistsДлительность 6–10 weeks
Тяжёлый кран · портDE · 2024

Liebherr

Brake, Germany

Electrical installation and commissioning of a portal crane: e-drive, cable drum, video monitoring and control systems, with testing support. The crew installed and connected the drive and control systems and supported acceptance testing.

Бригада 3–6 specialistsДлительность 4–8 weeks
Тяжёлый кран · портFI · 2022–2023

Mantsinen

Pietarsaari / Jakobstad, Finland

Installation and commissioning of hydraulic harbour cranes with dual power/electric systems, plus operator-training and testing support. The crew installed and connected the crane systems and supported testing and operator handover.

Бригада 3–6 specialistsДлительность 4–8 weeks
Тяжёлый кран · offshoreIT · 2024–2027

MELCAL / VARD Windward Offshore

Installation support for boat-landing cranes across a multi-vessel programme: hydraulics, radio controls, safety systems, testing and commissioning support. The crew supported installation and acceptance of the crane systems package by package.

Бригада 3–6 specialistsДлительность 4–8 weeks per vessel package

Список собран из завершённых и текущих проектов ARKTIS.GROUP. Записи с пометкой «на уточнении» ждут внутренней валидации.

FAQ

Какие проекты вы выполнили?+

Электромонтаж, механика, автоматизация и пусконаладка в дата-центрах, на заводах EV и автопрома, в автоматизированных распределительных центрах, чистых помещениях и на портовых кранах — для Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz, Audi и других.

Можете предоставить рекомендации?+

Наши кейсы содержат названия клиентов, локации и объёмы. По запросу и с учётом конфиденциальности мы обсудим детали проектов и свяжем вас, где клиент это разрешает. Capability pack даёт более полный обзор.

Как документируются проекты?+

Каждый проект сдаётся с записями QA/QC, журналами монтажа и исполнительными чертежами, которые ожидает приёмка. Мы работаем в вашей системе документооборота и соглашениях по именованию, чтобы закрытие было готово к аудиту.