BMW Dingolfing
Dingolfing, Germany
Скоуп
Electrical installation for production logistics, conveyor and transport systems and equipment for electrified-vehicle production. The crew installed and connected the logistics and transport equipment inside a large running plant.
Вызов
Integrating new logistics and production equipment within a large, continuously running automotive plant meant working around live operations and strict access and safety constraints.
Роль ARKTIS
Electrical installation crew for the conveyor, transport and production-logistics equipment, executing to the client design within the operating plant.
/ результат
The logistics and transport systems were connected and made ready for testing and commissioning.
/ больше
Больше из этой индустрии
Нужен похожий скоуп?
Скажите страну, скоуп и сроки — вернёмся в 48 часов.