BMW Dingolfing
Dingolfing, Germany
Scope
Electrical installation for production logistics, conveyor and transport systems and equipment for electrified-vehicle production. The crew installed and connected the logistics and transport equipment inside a large running plant.
Herausforderung
Integrating new logistics and production equipment within a large, continuously running automotive plant meant working around live operations and strict access and safety constraints.
ARKTIS-Rolle
Electrical installation crew for the conveyor, transport and production-logistics equipment, executing to the client design within the operating plant.
/ ergebnis
The logistics and transport systems were connected and made ready for testing and commissioning.
/ weitere
Weitere aus dieser Branche
FAQ
Welche Projekte haben Sie umgesetzt?+
Elektro-, Mechanik-, Automations- und Inbetriebnahme-Gewerke in Rechenzentren, EV- und Automobilwerken, automatisierten Verteilzentren, Reinräumen und an Hafenkranen — u. a. für Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz und Audi.
Können Sie Referenzen nennen?+
Unsere Case Studies nennen Kunden, Standorte und Gewerke. Auf Anfrage und unter Wahrung der Vertraulichkeit besprechen wir relevante Projektdetails und stellen Kontakt her, wo der Kunde es erlaubt. Das Capability Pack bietet einen umfassenderen Überblick.
Wie werden Projekte dokumentiert?+
Jedes Projekt wird mit QA/QC-Nachweisen, Installationsprotokollen und As-built-Redlines übergeben, die Ihr Abnahmeprozess erwartet. Wir arbeiten in Ihrem Dokumentenmanagementsystem und Ihren Namenskonventionen, damit der Abschluss audit-fähig ist.
Brauchen Sie eine ähnliche Umsetzung?
Nennen Sie Land, Scope und Zeitfenster — Rückmeldung innerhalb von 48 Stunden.