ARKTIS.GROUP
← Projektid
Automotive tootmine DE · 2021

BMW Dingolfing

Dingolfing, Germany

Riik
Germany
Aasta
2021
Meeskond
6–12 specialists
Kestus
2–3 months

Maht

Electrical installation for production logistics, conveyor and transport systems and equipment for electrified-vehicle production. The crew installed and connected the logistics and transport equipment inside a large running plant.

Väljakutse

Integrating new logistics and production equipment within a large, continuously running automotive plant meant working around live operations and strict access and safety constraints.

ARKTIS roll

Electrical installation crew for the conveyor, transport and production-logistics equipment, executing to the client design within the operating plant.

/ tulemus

The logistics and transport systems were connected and made ready for testing and commissioning.

KKK

Milliseid projekte olete teostanud?+

Elektri-, mehaanika-, automaatika- ja kasutuselevõtu töid andmekeskustes, EV ja autotehastes, automatiseeritud jaotuskeskustes, puhtaruumides ja sadamakraanadel — Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz ja Audi.

Kas saate esitada referentse?+

Meie juhtumiuuringud loetlevad kliendid, asukohad ja mahud. Soovi korral ja konfidentsiaalsust arvestades arutame projektide detaile ja ühendame teid, kui klient lubab. Capability pack annab põhjalikuma ülevaate.

Kuidas projekte dokumenteeritakse?+

Iga projekt antakse üle QA/QC kirjete, paigalduslogide ja teostusjoonistega, mida vastuvõtt ootab. Töötame teie dokumendihaldussüsteemis ja nimekonventsioonides, et lõpetamine oleks auditivalmis.

Vajate sarnast teostust?

Öelge riik, maht ja aeg — vastame 48 tunni jooksul.