Дата-центр DE · 2019

Mercury Engineering / FRA10

Frankfurt, Germany

Страна
Germany
Год
2019
Бригада
8–16 specialists
Длительность
3–6 months

Скоуп

MEP and data-centre works covering HV/LV distribution, backup generation with PLC control, life-safety and security systems, plant rooms and commissioning support. The crew installed and connected the power and safety systems and supported testing through to handover.

Вызов

A critical-facility fit-out with high-power redundancy and a strict delivery schedule required the power and life-safety systems to be installed and proven in a tightly sequenced programme.

Роль ARKTIS

Electrical and MEP subcontractor within the data-centre delivery package, executing the installation scope and supporting commissioning under the main contractor’s lead.

/ результат

Electrical, backup-power and life-safety systems were completed and documented for data-centre handover.

FAQ

Какие проекты вы выполнили?+

Электромонтаж, механика, автоматизация и пусконаладка в дата-центрах, на заводах EV и автопрома, в автоматизированных распределительных центрах, чистых помещениях и на портовых кранах — для Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz, Audi и других.

Можете предоставить рекомендации?+

Наши кейсы содержат названия клиентов, локации и объёмы. По запросу и с учётом конфиденциальности мы обсудим детали проектов и свяжем вас, где клиент это разрешает. Capability pack даёт более полный обзор.

Как документируются проекты?+

Каждый проект сдаётся с записями QA/QC, журналами монтажа и исполнительными чертежами, которые ожидает приёмка. Мы работаем в вашей системе документооборота и соглашениях по именованию, чтобы закрытие было готово к аудиту.

Нужен похожий скоуп?

Скажите страну, скоуп и сроки — вернёмся в 48 часов.