ARKTIS.GROUP
← Case studies
Intralogistics · e-commerce NL · 2019–2021

bol.com Fulfilment Center

Waalwijk, Netherlands

Country
Netherlands
Year
2019–2021
Team
8–14 specialists
Duration
3–5 months

Scope

Electrical installation of automated warehouse systems for an e-commerce fulfilment centre: conveyors, sorters, shuttle/miniload zones, control cabinets, sensors and cable routes. Crews installed and connected the equipment across the material-flow system and supported commissioning.

Challenge

High-throughput e-commerce automation creates many interfaces between the mechanical, electrical and controls packages, so the electrical works had to align tightly with the other trades to keep the material flow continuous.

ARKTIS role

Electrical installation crew for the warehouse automation equipment, executing to the integrator’s design and connecting field devices, cabinets and cable routes across the system.

/ result

The automated material-flow equipment was connected and made ready for commissioning.

Need a similar scope executed?

Tell us the country, scope and timing — we come back within 48 hours.