ARKTIS.GROUP
← Références
Intralogistique · e-commerce NL · 2019–2021

bol.com Fulfilment Center

Waalwijk, Netherlands

Pays
Netherlands
Année
2019–2021
Équipe
8–14 specialists
Durée
3–5 months

Scope

Electrical installation of automated warehouse systems for an e-commerce fulfilment centre: conveyors, sorters, shuttle/miniload zones, control cabinets, sensors and cable routes. Crews installed and connected the equipment across the material-flow system and supported commissioning.

Défi

High-throughput e-commerce automation creates many interfaces between the mechanical, electrical and controls packages, so the electrical works had to align tightly with the other trades to keep the material flow continuous.

Rôle ARKTIS

Electrical installation crew for the warehouse automation equipment, executing to the integrator’s design and connecting field devices, cabinets and cable routes across the system.

/ résultat

The automated material-flow equipment was connected and made ready for commissioning.

FAQ

Quels types de projets avez-vous réalisés ?+

Des lots électriques, mécaniques, d’automatisation et de mise en service sur data centers, usines EV et automobiles, centres de distribution automatisés, salles blanches et grues portuaires — pour Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz et Audi.

Pouvez-vous fournir des références ?+

Nos études de cas citent clients, sites et périmètres. Sur demande et dans le respect de la confidentialité, nous pouvons détailler des projets pertinents et vous mettre en relation lorsque le client l’autorise. Le capability pack offre un aperçu plus complet.

Comment les projets sont-ils documentés ?+

Chaque projet est livré avec les enregistrements QA/QC, journaux d’installation et plans as-built attendus par votre réception. Nous travaillons dans votre GED et vos conventions de nommage pour un bouclage prêt pour l’audit.

Besoin d’un scope similaire ?

Indiquez pays, scope et timing — réponse sous 48 heures.