Intralogistique · fret aérien LV · 2024–2025

airBaltic Baltic Cargo Hub

Riga, Latvia

Pays
Latvia
Année
2024–2025
Équipe
4–8 specialists
Durée
2–4 months

Scope

Electrical installation for material-handling systems, temperature-controlled zones, warehouse automation and engineering networks at an air-cargo hub. The crew installed and connected the handling and building systems and supported the move toward operational launch.

Défi

A cargo-hub environment combines temperature-controlled zones, time-critical logistics and airport-site coordination, so the electrical works had to fit airport access and security constraints while supporting reliable cold-chain and handling operation.

Rôle ARKTIS

Electrical installation crew for the logistics automation and supporting building systems, executing to the project design and coordinating with the main contractor on a secure airport site.

/ résultat

Cargo-handling and warehouse systems were installed and prepared for operational launch within the airport-site constraints.