airBaltic Baltic Cargo Hub
Riga, Latvia
Scope
Electrical installation for material-handling systems, temperature-controlled zones, warehouse automation and engineering networks at an air-cargo hub. The crew installed and connected the handling and building systems and supported the move toward operational launch.
Herausforderung
A cargo-hub environment combines temperature-controlled zones, time-critical logistics and airport-site coordination, so the electrical works had to fit airport access and security constraints while supporting reliable cold-chain and handling operation.
ARKTIS-Rolle
Electrical installation crew for the logistics automation and supporting building systems, executing to the project design and coordinating with the main contractor on a secure airport site.
/ ergebnis
Cargo-handling and warehouse systems were installed and prepared for operational launch within the airport-site constraints.
/ weitere
Weitere aus dieser Branche
Brauchen Sie eine ähnliche Umsetzung?
Nennen Sie Land, Scope und Zeitfenster — Rückmeldung innerhalb von 48 Stunden.