airBaltic Baltic Cargo Hub
Riga, Latvia
Maht
Electrical installation for material-handling systems, temperature-controlled zones, warehouse automation and engineering networks at an air-cargo hub. The crew installed and connected the handling and building systems and supported the move toward operational launch.
Väljakutse
A cargo-hub environment combines temperature-controlled zones, time-critical logistics and airport-site coordination, so the electrical works had to fit airport access and security constraints while supporting reliable cold-chain and handling operation.
ARKTIS roll
Electrical installation crew for the logistics automation and supporting building systems, executing to the project design and coordinating with the main contractor on a secure airport site.
/ tulemus
Cargo-handling and warehouse systems were installed and prepared for operational launch within the airport-site constraints.
/ rohkem
Rohkem sellest sektorist
KKK
Milliseid projekte olete teostanud?+
Elektri-, mehaanika-, automaatika- ja kasutuselevõtu töid andmekeskustes, EV ja autotehastes, automatiseeritud jaotuskeskustes, puhtaruumides ja sadamakraanadel — Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz ja Audi.
Kas saate esitada referentse?+
Meie juhtumiuuringud loetlevad kliendid, asukohad ja mahud. Soovi korral ja konfidentsiaalsust arvestades arutame projektide detaile ja ühendame teid, kui klient lubab. Capability pack annab põhjalikuma ülevaate.
Kuidas projekte dokumenteeritakse?+
Iga projekt antakse üle QA/QC kirjete, paigalduslogide ja teostusjoonistega, mida vastuvõtt ootab. Töötame teie dokumendihaldussüsteemis ja nimekonventsioonides, et lõpetamine oleks auditivalmis.
Vajate sarnast teostust?
Öelge riik, maht ja aeg — vastame 48 tunni jooksul.