airBaltic Baltic Cargo Hub
Riga, Latvia
Apjoms
Electrical installation for material-handling systems, temperature-controlled zones, warehouse automation and engineering networks at an air-cargo hub. The crew installed and connected the handling and building systems and supported the move toward operational launch.
Izaicinājums
A cargo-hub environment combines temperature-controlled zones, time-critical logistics and airport-site coordination, so the electrical works had to fit airport access and security constraints while supporting reliable cold-chain and handling operation.
ARKTIS loma
Electrical installation crew for the logistics automation and supporting building systems, executing to the project design and coordinating with the main contractor on a secure airport site.
/ rezultāts
Cargo-handling and warehouse systems were installed and prepared for operational launch within the airport-site constraints.
/ vairāk
Vairāk no šīs nozares
FAQ
Kādus projektus esat realizējuši?+
Elektro, mehānikas, automatizācijas un nodošanas darbus datu centros, EV un autobūves rūpnīcās, automatizētos sadales centros, tīrtelpās un pie ostas celtņiem — Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz un Audi.
Vai varat sniegt atsauksmes?+
Mūsu gadījumu izpētes uzskaita klientus, vietas un apjomus. Pēc pieprasījuma un ievērojot konfidencialitāti, varam apspriest projektu detaļas un savienot jūs, kur klients to atļauj. Capability pack sniedz pilnīgāku pārskatu.
Kā projekti tiek dokumentēti?+
Katrs projekts tiek nodots ar QA/QC ierakstiem, montāžas žurnāliem un izpildrasējumiem, ko sagaida pieņemšana. Strādājam jūsu dokumentu pārvaldības sistēmā un nosaukumu konvencijās, lai noslēgums būtu gatavs auditam.
Vajag līdzīgu izpildi?
Pasakiet valsti, apjomu un laiku — atbildēsim 48 stundu laikā.