ARKTIS.GROUP
← Referenties
Intralogistiek · e-commerce NL · 2019–2021

bol.com Fulfilment Center

Waalwijk, Netherlands

Land
Netherlands
Jaar
2019–2021
Ploeg
8–14 specialists
Duur
3–5 months

Scope

Electrical installation of automated warehouse systems for an e-commerce fulfilment centre: conveyors, sorters, shuttle/miniload zones, control cabinets, sensors and cable routes. Crews installed and connected the equipment across the material-flow system and supported commissioning.

Uitdaging

High-throughput e-commerce automation creates many interfaces between the mechanical, electrical and controls packages, so the electrical works had to align tightly with the other trades to keep the material flow continuous.

ARKTIS-rol

Electrical installation crew for the warehouse automation equipment, executing to the integrator’s design and connecting field devices, cabinets and cable routes across the system.

/ resultaat

The automated material-flow equipment was connected and made ready for commissioning.

FAQ

Wat voor projecten heeft u uitgevoerd?+

Elektrische, mechanische, automatiserings- en inbedrijfstellingsscopes op datacenters, EV- en autofabrieken, geautomatiseerde distributiecentra, cleanrooms en havenkranen — voor o.a. Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz en Audi.

Kunt u referenties geven?+

Onze case studies vermelden klanten, locaties en scopes. Op verzoek en met inachtneming van vertrouwelijkheid bespreken we relevante projectdetails en brengen we u in contact waar de klant dit toestaat. De capability pack geeft een vollediger overzicht.

Hoe worden projecten gedocumenteerd?+

Elk project wordt opgeleverd met de QA/QC-records, installatielogs en as-built redlines die uw acceptatie verwacht. We werken in uw documentbeheersysteem en naamgevingsconventies zodat de afsluiting audit-klaar is.

Een vergelijkbare scope nodig?

Geef land, scope en timing — reactie binnen 48 uur.