ARKTIS.GROUP
← Case studies
Automotive manufacturing DE · 2023

Audi / Volkswagen Group Ingolstadt

Ingolstadt, Germany

Country
Germany
Year
2023
Team
4–8 specialists
Duration
4–8 weeks

Scope

Electrical and controls installation: control cabinets, PLC/HMI wiring, robotic-cell connections and sealer/material-handling line support. The crew wired and connected the robotic and material-handling equipment to OEM standards and supported testing.

Challenge

Precise integration of robotic equipment and controls within strict OEM production standards required careful wiring, checking and documentation of every cell connection.

ARKTIS role

Electrical and controls installation crew for the robotic and material-handling equipment, executing to the OEM design and supporting the controls integration.

/ result

The robotic and material-handling equipment was connected and prepared for testing and commissioning.

Need a similar scope executed?

Tell us the country, scope and timing — we come back within 48 hours.